top of page
20181107-P10167 - BCC Led Lighting_IMG_3498.JPG

Brisbane City Council
LED Project

Brisbane City Council’s City Projects Office engaged HIG to undertake inspection, assessment, data validation and compilation, luminaire suitability, market assessment and contact, structural assessment, maintenance needs, design input and project management associated with the replacing luminaires on up to 8,000 lights in parks, pathways and public spaces with energy efficient LED luminaires as part of the Energy Efficient Lighting for Brisbane Project.

Client

Brisbane City Council (BCC)

Project Category

Lighting Design

Timeframe

January 2021 – February 2022

Our Project Mission

The project proposes to install the LED luminaires in order to reduce energy load and operations and maintenance costs for the operation of public lighting.

Our Approach

HIG personnel provided a unique mix of electrical, civil, structural and project management skills that allowed adaptability to a changing scope and interactive communication and problem solving with the City Projects team.

Data validation was a challenge on this project given the age of existing poles and the myriad of location and ownership matters. Acceptance of suitability and structural suitability assessment of existing poles in the absence of pole details was a further challenge that considered assumed structural modelling.

 

Both challenges were addressed by the collaborative required consideration of risk management and acceptance of suitability with qualification.

This commission was extended to include lighting design to assist the City Projects in delivering the first tranche of 4,000 lights.

Ready to Achieve Remarkable Results?

Let's collaborate to create exceptional outcomes for your infrastructure and development projects.

Experience our multidisciplinary expertise in Engineering, Design and Project Management.

bottom of page