Deebing Creek Bikeway

Harrison Infrastructure Group (HIG) were engaged by Ipswich City Council (ICC) to deliver a detailed design for the first stage of the proposed Deebing Creek Bikeway. 

Client

Ipswich City Council (ICC)

Deebing Creek Bikeway 1.png

Project Category

Active Transport

Timeframe

2021 Completion

Our Project Mission

Our mission was to achieve a high quality and low stress commuter cycle facility between the Ipswich City Centre and emerging Ripley Valley. The proposed bikeway would form part of the Department of Transport and Main Roads (DTMR) principal cycle network within the City of Ipswich. 

Deebing Creek Bikeway 3.png

Our Approach

The project required multiple road crossings and consideration of over 10 intersections. Although the major road crossing remained with vehicle priority, all minor road crossings were converted to provide priority to cyclists via raised priority crossings to ensure directness, safety and comfort. 

The project scope included a combination of 3m wide shared use path and 3m wide in verge/on-road bi-directional cycle track on Thorn Street. 

Deebing Creek Bikeway 3.png

The Result

The design was consistent with the Safe System Approach and DTMR’s Active Transport Investment Program requirements, ensuring appropriate vehicle speeds, so that the public were not exposed to crash forces that would lead to fatal and serious injury outcomes.

The project placed priority on the cyclist mode of travel to suit the requirements outlined in DTMR’s Active Transport Investment Program.

Ready to Achieve Remarkable Results?

Let's collaborate to create exceptional outcomes for your infrastructure and development projects.

Experience our multidisciplinary expertise in Engineering, Design and Project Management.

bottom of page